Citizen Portal
Sign In

Get Full Government Meeting Transcripts, Videos, & Alerts Forever!

Get email alerts on the Historic Preservation topic

No spam. Unsubscribe anytime.

Commission OKs most exterior work at 750 Bedford Avenue pending landscaping and light/door details

2364465 · February 20, 2025
AI-Generated Content: All content on this page was generated by AI to highlight key points from the meeting. For complete details and context, we recommend watching the full video. so we can fix them.

Summary

The commission supported the bulk of the exterior alterations at 750 Bedford Avenue — including porch repair, door replacement and landscaping — but continued the landscaping portion and required cut sheets for a half-light rear door and a simple front light fixture before final approval.

The commission reviewed an application for 750 Bedford Avenue that included completed exterior work (porch repairs, new decking and light fixtures), replacement of rear doors and proposed landscape changes including a concrete pad, a 4-foot-by-12-inch stone bed border and new plantings.

Staff recommended approval of CUA2400527 with conditions: the landscaping portion is continued to allow the applicant to submit a revised site plan for the proposed plantings and hardscape; the applicant must submit a cut sheet or drawing for a rear half-light door (wood, steel or smooth fiberglass) and a cut sheet for a simple light fixture for staff review. Staff cited City Code 3016.11 (standards for alteration) and 316.13 (standards for site improvements) in support of its recommendation.

The applicant (who identified himself during the hearing) said much of the work has already been completed and agreed to remove the proposed additional stone edging from the front yard after commissioners said it would compete with the existing masonry retaining wall. Commissioners also discussed security lighting on the rear and garage and accepted a security fixture there so long as the front-facing fixture matches a simple Arts-and-Crafts-style light on the primary facade.

The commission agreed to approve the application with the staff-listed conditions, asked the applicant to submit a landscape plan to the portal, and noted the landscaping could be returned for future review if it is not ready at the time of final staff review. Staff will verify the submitted cut sheets and landscaping details prior to issuing final clearance.