Citizen Portal
Sign In

Get Full Government Meeting Transcripts, Videos, & Alerts Forever!

Atchison OKs $83,333 contract for valve replacement at water treatment plant

5934761 · August 4, 2025
AI-Generated Content: All content on this page was generated by AI to highlight key points from the meeting. For complete details and context, we recommend watching the full video. so we can fix them.

Summary

The commission authorized hiring Mega KC to replace two valves at the water treatment plant using a line-stop freeze procedure, approving $83,333.38 with $2,000 in change-order authority; staff said the valves are seized and threaten the ability to reliably backwash filters.

The Atchison City Commission authorized city staff to hire Mega KC to replace a 16-inch and a 12-inch valve at the municipal water treatment plant and to perform a line-stop freeze to isolate the pipeline during the work.

Clinton McNamee, who presented the item on behalf of city staff, said the commission had previously approved replacing the South Tower booster pump but contractors discovered the valves used to isolate the pump were seized and could not be closed. McNamee described a "line stop freeze" procedure in…

Already have an account? Log in

Subscribe to keep reading

Unlock the rest of this article — and every article on Citizen Portal.

  • Unlimited articles
  • AI-powered breakdowns of topics, speakers, decisions, and budgets
  • Instant alerts when your location has a new meeting
  • Follow topics and more locations
  • 1,000 AI Insights / month, plus AI Chat
30-day money-back on paid plans