Citizen Portal
Sign In

Get Full Government Meeting Transcripts, Videos, & Alerts Forever!

Board allows 2.5‑foot extension of dock at 2050 Boca Ciega Drive after dredging options closed; requires light at dock end

Board of Adjustment, City of St. Pete Beach · October 30, 2025
AI-Generated Content: All content on this page was generated by AI to highlight key points from the meeting. For complete details and context, we recommend watching the full video. so we can fix them.

Summary

The Board of Adjustment approved a variance to extend an existing nonconforming dock at 2050 Boca Ciega Drive where dredging to deepen the channel was not feasible. Staff asked that dredging documentation be entered into the record; the board added a condition that lighting or reflectors be placed at the dock end.

The Board of Adjustment approved a request to extend the lower landing of an existing dock at 2050 Boca Ciega Drive, allowing a 2–2.5 foot extension that increases the overall length to approximately 106 feet where 37.9 feet is permitted. Staff explained the application seeks relief from land development code section 6.23(d)(3) for a nonconforming dock and requested additional testimony about a previously submitted dredging permit.

Applicant Micah Thompson of Gulf and Bay Dock Works…

Already have an account? Log in

Subscribe to keep reading

Unlock the rest of this article — and every article on Citizen Portal.

  • Unlimited articles
  • AI-powered breakdowns of topics, speakers, decisions, and budgets
  • Instant alerts when your location has a new meeting
  • Follow topics and more locations
  • 1,000 AI Insights / month, plus AI Chat
30-day money-back on paid plans