Get Full Government Meeting Transcripts, Videos, & Alerts Forever!
Schneider Electric presents energy-efficiency plan; commission authorizes detailed design phase
Summary
After a revised audit showing an estimated 23% utility reduction for city buildings, commissioners directed staff to return with Schneider Electric's 30/60/90% design deliverables and consider a $57,000 IGA to develop a firm turnkey proposal.
Schneider Electric presented a revised analysis of municipal facilities showing an estimated 23% reduction in utility consumption if the city proceeds with a proposed package of LED lighting upgrades and building-automation controls, with optional additional measures (HVAC replacement, roofing and building-envelope work) that carry longer payback periods. Schneider representatives said a smaller-sized package (LED lighting +…
Already have an account? Log in
Subscribe to keep reading
Unlock the rest of this article — and every article on Citizen Portal.
- Unlimited articles
- AI-powered breakdowns of topics, speakers, decisions, and budgets
- Instant alerts when your location has a new meeting
- Follow topics and more locations
- 1,000 AI Insights / month, plus AI Chat

