Citizen Portal
Sign In

Get Full Government Meeting Transcripts, Videos, & Alerts Forever!

Get email alerts on the Telecom topic

No spam. Unsubscribe anytime.

Attorney flags aesthetic and structural questions after carrier proposes antennas atop village water tower

Village of Riverwoods Board of Trustees · November 5, 2025
AI-Generated Content: All content on this page was generated by AI to highlight key points from the meeting. For complete details and context, we recommend watching the full video. so we can fix them.

Summary

Village attorney reported Verizon/Horizon proposed placing antennas on top of the water-tower ball rather than on the stem; he said a structural analysis will be required and discussed screening options to minimize visual impact while allowing signal propagation.

Village Attorney Kovar updated trustees on negotiations with Verizon and Horizon over a possible lease for antennas on the village water tower. He said the carriers' plans show antennas mounted on top of the ball rather than clustered on the stem, which ‘‘is gonna look a little different’’ and could raise aesthetic concerns.

Kovar said a structural analysis would be required ‘‘no matter what they do up there because we're obviously increasing the wind load.’’ He added that from his wireless-site experience ‘‘I would not anticipate this to be anything that we have to structurally reinforce this water tank,’’ but stressed he had not yet reviewed drawings or a prior structural analysis. He said screening (for example, a fiberglass shroud) could hide antenna panels but could change engineering considerations and would require additional analysis.

Trustees asked whether the carrier or village would pay for screening; Kovar said the village typically requires the carrier to provide screening. Discussion included a desire to minimize visual impact and consider painting and other mitigation to preserve the tower’s appearance.

Why it matters: placement of telecommunications equipment on municipal structures raises structural, aesthetic and procedural questions; the board will need to review proposed drawings, structural analysis and screening plans and to decide whether to require mitigation by the carrier.

Provenance: Kovar’s remarks beginning at 00:36:34 through 00:41:27 capture the carrier proposal details, structural-analysis requirement and screening discussion (topicintro/topicfinish).