City moves forward with basic plan for 3,500-seat indoor music venue on Executive Boulevard

City of Huber Heights City Council ยท November 5, 2025

Get AI-powered insights, summaries, and transcripts

Subscribe
AI-Generated Content: All content on this page was generated by AI to highlight key points from the meeting. For complete details and context, we recommend watching the full video. so we can fix them.

Summary

The city presented a basic development plan for an 18-acre, 3,500-capacity indoor music venue with roughly 1,200 parking spaces, a new regional detention pond and multiple entrances; planning commission unanimously recommended approval while staff said traffic and stormwater will be managed through phased design.

Huber Heights planning staff presented a city-sponsored basic development plan for an indoor music venue with a 3,500-person capacity on Nov. 5, describing site layout, parking, access points and regional stormwater infrastructure needs.

The proposal covers roughly 18 acres and would include a main entrance spine through a general-admission (GA) parking field, a shared entrance at the Meyer lighted interchange and a VIP entry on Lehman Drive. Staff said the proposed parking supply is roughly 1,200 spaces, a ratio comparable to the nearby Rose Music Center. To manage runoff for future development across the corridor the plan envisions constructing a larger regional detention pond north of an existing parking area; staff said that pond will be required regardless of the venue because of broader redevelopment needs.

Planning staff said they are presenting a basic development plan now so site preparation and necessary stormwater work can proceed; they noted the building setback standards, pavement separation distances from residential structures and landscaping standards will be refined in a later detailed development plan. Planning commission voted unanimously to recommend the basic development plan.

Council members asked about traffic management during simultaneous events at the Rose and the new venue; staff said signal control and cooperative event scheduling with the same management company should manage peak flows and that manual police-signal operation would be used for certain exit scenarios.

Why it matters: A large indoor venue would change event capacity and traffic patterns across Executive Boulevard and could drive future hospitality or mixed-use development in the entertainment district; stormwater infrastructure requirements will involve citywide planning and capital investment.