Board approves long-range facilities plan and gym-floor change order as district outlines $200M in deferred maintenance needs

Riverside Unified School District Board of Education · November 7, 2025

Get AI-powered insights, summaries, and transcripts

Subscribe
AI-Generated Content: All content on this page was generated by AI to highlight key points from the meeting. For complete details and context, we recommend watching the full video. so we can fix them.

Summary

Riverside Unified’s governing board voted Thursday to approve a draft long-range facilities plan and to authorize change order No. 1 for a high-school gym floor repair.

Riverside Unified’s governing board voted Thursday to approve a draft long-range facilities plan and to authorize change order No. 1 for a high-school gym floor repair, actions staff said will help the district pursue funding and address immediate building needs.

Staff presented the long-range facilities plan and said it is a "living" document that will be amended as project details and funding opportunities are finalized. Presenters told the board that the plan includes Career Technical Education (CTE) program needs and that staff plan to return with an amendment after further review and before submitting funding requests in December.

"Pedimos su consideración esta tarde," said a staff presenter identified in the presentation as Mr. William, explaining the need to approve the plan to meet funding timelines. Board members moved and seconded the measure and the board approved the plan unanimously.

Later in the meeting, facilities staff described change order No. 1 for repair of a high-school gym floor substructure. Staff reported that during work crews uncovered additional damaged subfloor — "75 feet and a 5 feet, 6 inches" beyond the original allowance — and that the cost to repair the floor under the change order was $19,200. The presenter explained the relatively large percentage increase reflected the small original project budget (about $64,000), producing a near 29.6% increase in contract value for this element.

The board moved, seconded and approved the change order. No members requested further public comment before the votes were taken.

Facilities staff also presented a slate of recent and planned capital projects, noting a districtwide deferred-maintenance backlog staff described as about $200 million. The presentation included examples of recently completed work — HVAC replacements (91 units in a recent cycle), new turf and athletic updates, playground surface replacements and roofing projects — and an overview of prioritization criteria (safety, instructional impact and condition data). Staff said many projects require engineering and planning and that summer schedules limit construction windows.

Board members praised the visual improvements and recommended increased public communication to highlight completed projects ahead of possible future bond measures. One board member suggested a public communications campaign to show voters how funds were spent and to build trust for future investments.

Why it matters: Approving the long-range facilities plan moves the district closer to applying for funding tied to CTE and other capital programs; approving the change order allowed an in-progress renovation to proceed and prevented further damage during out-of-session months.

Speakers

- Mr. William, Facilities presenter (district staff) - Prissy (Mr. Prizzi), Facilities project lead (district staff) - Regis Roses, Facilities manager (district staff) - Juan Jiménez, Facilities staff (district staff) - Dr. Cuit, Board member (recorded as second on plan motion) - Board members (motion makers/approvers)

Authorities

[{"type":"statute","name":"Education Code (Williams compliance referenced)","citation":"Education Code / Williams settlement requirements","referenced_by":["facilities_presentation"]}]

Actions

[{"kind":"motion","identifiers":{"agenda_item_id":"action_long_range_facilities_plan"},"motion":"Approve draft long-range facilities plan (document to be amended later)","mover":"not specified","second":"Dr. Cuit","vote_record":[{"member":"Board","vote":"yes"}],"tally":{"yes":null,"no":0,"abstain":0},"legal_threshold":{"met":true,"notes":"Vote recorded as unanimous in meeting transcript."},"outcome":"approved","notes":"Staff noted plan is a living document; amendment to follow before funding submittal."},{"kind":"motion","identifiers":{"agenda_item_id":"action_gym_floor_change_order","project_slug":"gym_floor_repair"},"motion":"Approve change order No. 1 to repair gym floor substructure","mover":"not specified","second":"not specified","vote_record":[{"member":"Board","vote":"yes"}],"tally":{"yes":null,"no":0,"abstain":0},"legal_threshold":{"met":true,"notes":"Vote recorded as unanimous in meeting transcript."},"outcome":"approved","notes":"Change order cost reported as $19,200; staff said cost increase reflects additional subfloor repairs and small original project budget."}]

Clarifying details

[{"category":"deferred_maintenance","detail":"District deferred maintenance backlog","value":200000000,"units":"USD","approximate":true,"source_speaker":"Prissy"},{"category":"change_order_cost","detail":"Cost of gym floor repair under change order No. 1","value":19200,"units":"USD","approximate":false,"source_speaker":"Facilities presenter"},{"category":"original_project_budget","detail":"Approximate original project budget for gym floor work","value":64000,"units":"USD","approximate":true,"source_speaker":"Facilities presenter"},{"category":"uncovered_damage","detail":"Extent of additional subfloor damage discovered","value":"75 ft and 5 ft 6 in","units":"linear feet/inches","approximate":false,"source_speaker":"Facilities presenter"}]

Proper_names

[{"name":"Riverside Adult School","type":"location"},{"name":"Riverside Unified","type":"organization"}]

Searchable_tags

["facilities","deferred_maintenance","CTE","change_order","Riverside Unified"]

Provenance

[{"block_id":"8944.845","local_start":0,"local_end":300,"evidence_excerpt":"Este punto es un poquito antes de tiempo y esto estoy espero que estén que estén de acuerdo con el que lo estemos presentando en este momento... La diapositiva muestra la razón, las el plan requiere que presentemos un plan de sala a largo plazo para aprobar la junta...","global_start":8944,"global_end":9244,"tc_start":"02:29:04","tc_end":"02:34:04","reason_code":"topicintro"},{"block_id":"9196.33","local_start":0,"local_end":300,"evidence_excerpt":"Este punto es para solicitar aprobación para el la orden de cambio número 1 para el el piso del gimnasio... El costo de la reparación del piso fue 19200... el proyecto bajo de 64000... un aumento del 29.6%...","global_start":9196,"global_end":9496,"tc_start":"02:33:16","tc_end":"02:38:16","reason_code":"topicfinish"}]

Salience

{"overall":0.72,"overall_justification":"Facilities approvals unlock funding opportunities and address immediate safety and instructional infrastructure needs; deferred maintenance is substantial.","impact_scope":"local","impact_scope_justification":"Affects capital conditions across Riverside Unified schools.","attention_level":"high","attention_level_justification":"Approvals affect budgets and future bond considerations.","novelty":0.35,"novelty_justification":"Routine capital planning but notable for scale of projects and backlog.","timeliness_urgency":0.65,"timeliness_urgency_justification":"Time-sensitive for funding submittals and summer construction windows.","legal_significance":0.20,"legal_significance_justification":"Williams/Ed Code maintenance compliance mentioned; procurement and contracting rules apply.","budgetary_significance":0.70,"budgetary_significance_justification":"Deferred-maintenance estimate and approved change orders impact capital budgets.","public_safety_risk":0.20,"public_safety_risk_justification":"Some projects address safety-critical building systems.","budget_total_usd":200000000,"budget_total_usd_justification":"Staff cited roughly $200 million in deferred maintenance needs in the presentation.","decision_deadline":"2025-12-04","decision_deadline_justification":"Staff noted an upcoming December funding/submittal timeline."}