This article was created by AI summarizing key points discussed. AI makes mistakes, so for full details and context, please refer to the
video of the full meeting.
Please report any errors so we can fix them.
Report an error »
The Troy City Planning Commission approved a preliminary site plan for the Somerset Retail infill on Big Beaver Road, a redevelopment of the existing Somerset Hotel site that adds six new speculative retail buildings and retains several existing structures including the hotel and parking garage.
Applicant Jordan Jonah (AF Jonah Development) said the project will repurpose existing surface parking with new buildings and improve pedestrian connections; he told the commission the developer will expand window lines and add sidewalks and landscaped islands to meet transparency and pedestrian objectives. Jonah said tenant build‑outs will determine final door and glazing locations but that the owner will work to meet the ordinance requirements.
Staff described the site as located in the Big Beaver form‑based district and said the plan complies with most bulk standards while seeking three deviations: an 18.6‑foot setback deviation on Lakeview, a 19.6‑foot setback deviation on Butterfield and a waiver of the dedicated loading‑space requirement. Staff noted the site provides more than 1,300 parking spaces overall; the applicant is proposing shared parking across the mixed uses.
Planning staff also flagged two ordinance items that cannot be waived by the commission and must be satisfied: a functioning entrance on street‑facing frontages and a 50% transparency requirement on façades that front public streets. The applicant indicated those elements will be addressed in revised elevations or as tenant build‑outs are finalized.
Commissioners discussed pedestrian circulation, loading and trash collection—some commissioners preferred compactors rather than open dumpsters to reduce frequent collection noise—and commended the project’s architectural approach and added green islands to break up the parking field.
The commission approved a resolution to grant the requested setback deviations and the loading waiver conditionally and to require final plans to meet transparency and entrance requirements. The recorded vote was unanimous.
What’s next: The project will proceed to final engineering and tenant build‑outs; staff and the applicant said final elevations and tenant fit‑outs must show the required entrances and glazing on Big Beaver and Lakeview before building permits are issued.
Sources and attribution: Details and quotations are drawn from the planning staff presentation and applicant remarks at the Troy Planning Commission meeting.
View full meeting
This article is based on a recent meeting—watch the full video and explore the complete transcript for deeper insights into the discussion.
Search every word spoken in city, county, state, and federal meetings. Receive real-time
civic alerts,
and access transcripts, exports, and saved lists—all in one place.
Gain exclusive insights
Get our premium newsletter with trusted coverage and actionable briefings tailored to
your community.
Shape the future
Help strengthen government accountability nationwide through your engagement and
feedback.
Risk-Free Guarantee
Try it for 30 days. Love it—or get a full refund, no questions asked.
Secure checkout. Private by design.
⚡ Only 8,165 of 10,000 founding memberships remaining
Explore Citizen Portal for free.
Read articles and experience transparency in action—no credit card
required.
Upgrade anytime. Your free account never expires.
What Members Are Saying
"Citizen Portal keeps me up to date on local decisions
without wading through hours of meetings."
— Sarah M., Founder
"It's like having a civic newsroom on demand."
— Jonathan D., Community Advocate
Secure checkout • Privacy-first • Refund within 30 days if not a fit