Citizen Portal
Sign In

Get Full Government Meeting Transcripts, Videos, & Alerts Forever!

Panama City engineers outline stormwater inventory, options for utility fee and green-infrastructure incentives

Panama City Commission · November 3, 2025
AI-Generated Content: All content on this page was generated by AI to highlight key points from the meeting. For complete details and context, we recommend watching the full video. so we can fix them.

Summary

City engineers briefed the commission on the state of Panama City's drainage network and presented options to fund capacity projects, including a possible implementation of the existing stormwater utility code or a fee-in-lieu program.

City engineers briefed the commission on the condition of Panama City's drainage network and options to fund repairs and capacity projects, including implementing the city's existing stormwater utility code.

In a detailed presentation, city engineer Stacy Rausch said staff found nearly 6,000 stormwater inlets in GIS, about 900 manholes, more than 150 miles of drainage pipe and 167 ponds recorded as city-owned, plus more than 200 private ponds that feed the system. She told commissioners the annual streets and drainage budget is roughly $1.53 million, with only about $55,000 earmarked for materials.

Why it matters: Commissioners said stormwater capacity and funding affect downtown redevelopment, historic…

Already have an account? Log in

Subscribe to keep reading

Unlock the rest of this article — and every article on Citizen Portal.

  • Unlimited articles
  • AI-powered breakdowns of topics, speakers, decisions, and budgets
  • Instant alerts when your location has a new meeting
  • Follow topics and more locations
  • 1,000 AI Insights / month, plus AI Chat
30-day money-back on paid plans