Get Full Government Meeting Transcripts, Videos, & Alerts Forever!
Peabody commission requires trench drain, camera inspection for proposed Stacia Road driveway
Summary
For the 0 Stacia Road driveway extension, the commission required an infiltration trench detail with a trench drain grate, TV camera inspection of an existing 12‑inch pipe prior to construction, and plan revisions that show how the trench will tie to the catch basin; vote to continue/condition passed.
The Peabody Conservation Commission on Nov. 12 set technical conditions for a proposed driveway extension and utilities at 0 Stacia Road designed to serve a future dwelling. Attorney John Kelty and planner Christopher Mello told the commission the jurisdictional area was the 75‑foot driveway extension that enters the wetland buffer.
Commissioners were chiefly concerned with…
Already have an account? Log in
Subscribe to keep reading
Unlock the rest of this article — and every article on Citizen Portal.
- Unlimited articles
- AI-powered breakdowns of topics, speakers, decisions, and budgets
- Instant alerts when your location has a new meeting
- Follow topics and more locations
- 1,000 AI Insights / month, plus AI Chat

