Citizen Portal
Sign In

Get Full Government Meeting Transcripts, Videos, & Alerts Forever!

Peabody panel clears soil remediation at 24 Carla St., adds tree and rodent conditions

Peabody Conservation Commission · November 12, 2025
AI-Generated Content: All content on this page was generated by AI to highlight key points from the meeting. For complete details and context, we recommend watching the full video. so we can fix them.

Summary

The Peabody Conservation Commission approved an Order of Conditions for soil remediation at 24 Carla St. aimed at preparing the site for the Riverwalk, requiring limited tree removal, stump grinding near the river wall and a non‑poison rodent control plan to be submitted before work begins.

The Peabody Conservation Commission on Nov. 12 approved an Order of Conditions for remediation of 24 Carla Street, a riverfront parcel the city acquired in 2019 and plans to fold into the Peabody Riverwalk. The project is designed to achieve regulatory closure under the Massachusetts Contingency Plan and prepare the site for passive‑park use.

Joe Spencer of Weston & Sampson described the work as excavation and off‑site disposal of impacted soil — “up to 2,500 cubic yards” with an 18‑inch minimum cut across the site and deeper, targeted removals where polychlorinated biphenyls and lead…

Already have an account? Log in

Subscribe to keep reading

Unlock the rest of this article — and every article on Citizen Portal.

  • Unlimited articles
  • AI-powered breakdowns of topics, speakers, decisions, and budgets
  • Instant alerts when your location has a new meeting
  • Follow topics and more locations
  • 1,000 AI Insights / month, plus AI Chat
30-day money-back on paid plans