Citizen Portal
Sign In

Get Full Government Meeting Transcripts, Videos, & Alerts Forever!

Get email alerts on the Verizon Crown Mountain Tower topic

No spam. Unsubscribe anytime.

Pitkin County to consider lease with Verizon for Crown Mountain cell site; BLM approvals required

Pitkin County Board of County Commissioners · August 6, 2025
AI-Generated Content: All content on this page was generated by AI to highlight key points from the meeting. For complete details and context, we recommend watching the full video. so we can fix them.

Summary

Pitkin County telecommunications staff presented a proposed lease with Verizon Wireless to use county space on Crown Mountain and add antennas and a generator to a tower on BLM land; staff will bring an ordinance for first reading Aug. 13 and a public hearing Aug. 27, contingent on Bureau of Land Management SF-299 approvals.

Pitkin County telecommunications staff on Aug. 5 presented a proposed lease with Verizon Wireless to colocate equipment at the county’s Crown Mountain communications site near Basalt, a move intended to fill persistent cell-coverage gaps in Willits, Emma and Missouri Heights.

Jeff Krueger, the county telecommunications director, said Verizon would occupy an unused room in the county’s 45-by-20-foot shelter, install antennas on a 10-foot extension to the existing 60-foot tower, add microwave backhaul and install a new backup generator to serve the tenant space. “Their lease would be for this space here. They would also be adding a 10 foot extension to our 60 foot tower here,” Krueger said.

Krueger said the site sits on Bureau of Land Management land; both the county’s lease renewal and Verizon’s equipment addition require SF-299 filings with the BLM. He said the county anticipates BLM approval and plans to present an ordinance for first reading on Aug. 13 and a second-reading public hearing on Aug. 27, subject to the federal approvals.

Commissioners asked technical and safety questions: whether the site is manned (Krueger: not manned but accessible via Stone Mountain Road and plowed in winter), where coverage gaps would be filled, and whether the new generator will create wildfire or fuel-storage concerns. One commissioner asked whether the county or the applicant should consider alternative backup fuels instead of propane and whether construction details (fire separation/wall ratings between compartments) and sign-offs by county fire/engineering staff would be included in the regular-meeting packet.

Krueger said he would bring additional construction, wildfire-mitigation and generator details to the regular meeting packet and follow up on outstanding technical questions. The board signaled interest in a fuller public discussion at the Aug. 13 first reading.

Next steps: County staff will include lease documents and BLM SF-299 status in the Aug. 13 packet; BLM approval remains a condition of the lease.