Citizen Portal
Sign In

Get Full Government Meeting Transcripts, Videos, & Alerts Forever!

Engineering report finds Grace Pool in 'fair to poor' condition; restoration estimate $1.32 million

Freetown-Lakeville Regional School Committee · November 13, 2025
AI-Generated Content: All content on this page was generated by AI to highlight key points from the meeting. For complete details and context, we recommend watching the full video. so we can fix them.

Summary

An engineering assessment presented to the Freetown-Lakeville Regional School Committee found the Grace Pool in 'fair to poor' condition and estimated up to $1,323,550 to restore it; the pool subcommittee will deliver an initial report to the full committee by January and a full report by April.

An engineering assessment of the Grace Pool presented at the Freetown-Lakeville Regional School Committee meeting on Nov. 12 found multiple safety and equipment deficiencies and estimated a full restoration cost of $1,323,550.

Jack Higgins, who summarized the report, said the firm Aquatica Pools Inc. rated the facility "in fair to poor condition" and identified specific problems including a deteriorated stainless-steel gutter return, a hazardous pool equipment…

Already have an account? Log in

Subscribe to keep reading

Unlock the rest of this article — and every article on Citizen Portal.

  • Unlimited articles
  • AI-powered breakdowns of topics, speakers, decisions, and budgets
  • Instant alerts when your location has a new meeting
  • Follow topics and more locations
  • 1,000 AI Insights / month, plus AI Chat
30-day money-back on paid plans