Citizen Portal
Sign In

Get Full Government Meeting Transcripts, Videos, & Alerts Forever!

Get email alerts on the Housing topic

No spam. Unsubscribe anytime.

Commission approves conditional use to place manufactured home on existing building eligibility lot

Lincoln County Planning Commission · October 21, 2025
AI-Generated Content: All content on this page was generated by AI to highlight key points from the meeting. For complete details and context, we recommend watching the full video. so we can fix them.

Summary

Planning commissioners approved a conditional use permit allowing a manufactured double-wide home on a property with purchased building eligibility; staff found the site complies with dimensional and floodplain requirements and recommended approval with conditions.

The Planning Commission approved a conditional use permit to place a manufactured (HUD) double-wide home on a parcel that already contains or has purchased building eligibility.

Toby Brown said staff reviewed the site and determined the proposed placement would be outside the floodway and able to meet floodplain and yard-size requirements. The ordinance requires conditional use approval for manufactured-home placement in the A-1 district, and staff recommended three conditions.

Applicant Kelly Cawthorn said he intends to occupy the structure and that the proposed siting is on the highest portion of the parcel to avoid flooding concerns. Commissioners noted the area is a unique mix of zoning districts and that existing development nearby makes the placement consistent with the neighborhood pattern.

Commissioner Scott moved, Commissioner Boots seconded, and the CUP was approved by roll call. The applicant must obtain required permits, including any floodplain development permit, and meet the staff conditions prior to placement.