Citizen Portal
Sign In

Get Full Government Meeting Transcripts, Videos, & Alerts Forever!

Get email alerts on the Infrastructure topic

No spam. Unsubscribe anytime.

Campton Hills explores Village Hall generator options; no decision made

Campton Hills Village Board · November 19, 2025
AI-Generated Content: All content on this page was generated by AI to highlight key points from the meeting. For complete details and context, we recommend watching the full video. so we can fix them.

Summary

The village discussed multiple options to provide backup power for Village Hall — rooftop unit (structurally costly), side-yard unit (visual/sidewalk impacts) and a smaller basement generator (ventilation and code questions). Staff will continue research on costs and configuration before returning with a recommendation.

Village staff and Chief Levan briefed trustees on options for a Village Hall generator and said more research is required before the board commits to a purchase.

An early budgetary estimate given to staff was about $100,000 for a full exterior installation, and staff said KDOT offered a discounted unit; however a roof-mounted solution would require significant structural reinforcement and would be costly, while a side-mounted installation could interfere with the sidewalk and generate noise complaints during routine testing. A smaller generator located in the village building’s basement is an option staff is exploring — it may reduce enclosure/visual impacts but raises code questions about ventilation and exhaust.

Chief Levan said he and two trustees have developed options and solicited quotes; the board agreed staff should continue to study configurations and costs to arrive at the most cost-effective and least intrusive solution.

Next step: staff to check building-code and ventilation requirements for a basement unit, obtain final price quotes and return with a recommendation.