Citizen Portal
Sign In

Get Full Government Meeting Transcripts, Videos, & Alerts Forever!

Get email alerts on the Transportation topic

No spam. Unsubscribe anytime.

College Park urges MNCPPC to prioritize new Northeast Branch crossing at preferred site

College Park City Council · October 22, 2025
AI-Generated Content: All content on this page was generated by AI to highlight key points from the meeting. For complete details and context, we recommend watching the full video. so we can fix them.

Summary

After reviewing a feasibility study, the council authorized a mayor-and-council letter asking the Maryland-National Capital Park and Planning Commission to pursue engineering and design for a new pedestrian crossing near Calvert Road (Location 1) and to defer Campus Drive bridge changes for that purpose.

The College Park City Council on Oct. 21 authorized staff to send a letter to the Maryland-National Capital Park and Planning Commission (MNCPPC) urging the county agency to pursue engineering and design for a new pedestrian crossing of the Northeast Branch near Location 1 (roughly Calvert Road), based on a feasibility study prepared by KCI.

Staff context and recommendation: Park and planning staff summarized a feasibility study that identified three potential locations for a crossing and said Location 1 best meets the city’s objectives. The draft letter asks MNCPPC to prioritize a new crossing at Location 1 and to refrain from spending funds on Campus Drive bridge improvements that would not meet the same objectives.

Council discussion: Members sought clarity on who the letter represents (the mayor alone or the mayor and council). Staff explained the letter will be sent on mayor-and-council letterhead when the body votes to send it and will reference the council vote. Councilmember Hill asked about flood-zone exposure and durability for a crossing sited near the 100-year floodplain; staff said MNCPPC’s feasibility had considered options and some designs would be above the 100-year flood level.

Next steps: Council authorized the letter; staff will finalize text and send it on mayor-and-council letterhead and will continue to engage as detailed design proceeds.