KYTC outlines $531,304 resurfacing plan for Franklin County; US 460 shared-use path work order cleared

Franklin County Fiscal Court
AI-Generated Content: All content on this page was generated by AI to highlight key points from the meeting. For complete details and context, we recommend watching the full video. so we can fix them.

Summary

Kentucky Transportation District 5 proposed resurfacing 6.9 miles of St. John's Road and a short section of KY 561, leaving an estimated $15,389 carryover, and the court approved a work order for engineering design on a 0.5-mile shared-use path on US 460 with 80% federal reimbursement.

Kentucky Transportation Cabinet (KYTC) District 5 officials presented Franklin County fiscal court with their rural secondary resurfacing program and recommended projects for 2025—6. KYTC said the county's carryover of $104,544 plus an allotment of $948,289 yields an estimated $1,052,833 available before mandatory state service carve-outs.

KYTC planner Tom Holland said mandatory state services and a county flex allocation reduce the resurfacing fund to $531,304. He proposed completing resurfacing of St. John's Road (KY 1570) from Harvey Land Road to the Henry County line (about 6.9 miles; estimated cost $468,958) and a half-mile resurfacing of KY 561 (Guest Road) from US 421 to the Henry County line (estimated $46,957), leaving a small carryover for contingencies. Holland said projects would be bid in the fall with construction finished before July 1 next year if the court agrees.

Court members asked about decision authority for the county flex funds; KYTC said fiscal court typically selects roads in coordination with county staff, and road department staff (Duke Wilburn) confirmed the proposed roads are high-priority local needs.

Separately, the court approved a work order with HMB for engineering, design, advertising and bidding services for a planned 10-foot-wide, 0.5-mile shared-use path on US 460 from Sediment Town Lane to Huntley Ridge East Apartments. The work order cost is $74,404, of which 80% ($59,523) will be federally reimbursed and the required local match is $14,881. County staff said a budget transfer will be required; the transportation cabinet had approved the proposal.

KYTC and county members emphasized scheduling coordination among bridge projects, resurfacing and other programs to minimize disruptions; officials said some bridge repairs and slides may delay isolated sections but expected most work to finish near the start of the next construction season.