Commission approves conditional use permit for oversized garage at 1144 Pine Hills Drive

Rapid City Planning Commission · September 27, 2024

Get AI-powered insights, summaries, and transcripts

Subscribe
AI-Generated Content: All content on this page was generated by AI to highlight key points from the meeting. For complete details and context, we recommend watching the full video. so we can fix them.

Summary

Planning commissioners voted to approve a conditional use permit allowing an 18×20 accessory shed that increases accessory footprint by ~264 sq ft at 1144 Pine Hills Drive, subject to two stipulations including a concrete or asphalt floor.

The Rapid City Planning Commission approved a conditional use permit to allow an oversized garage (an 18‑by‑20‑foot storage shed) at 1144 Pine Hills Drive.

City planner Cassie Hayes told the commission the property is nearly 3 acres with a 960‑square‑foot single‑family dwelling and an existing 864‑square‑foot garage; adding the proposed shed would cause the total footprint of accessory structures to exceed that of the principal dwelling by about 264 square feet, which necessitated a conditional use permit. Hayes said the applicant submitted construction drawings and a statement of intent; staff recommended approval with two stipulations, including that the shed have a concrete or asphalt floor and be built with a single‑stall garage door. "Ultimately, staff is recommending approval of the conditional use permit to allow the oversized garage, and there are 2 stipulations attached to that," Hayes said.

Vicky added that the applicant said the structure would primarily store a riding lawnmower and that the existing driveway approach could serve vehicular access if a vehicle were stored there; she noted past oversized‑garage cases had raised access concerns but that the current approach appeared adequate.

Brooke moved to approve the permit with staff stipulations; Vince seconded. The commission voted in favor and the motion carried. The permit was approved with the attached stipulations.

Next steps: The permit will be implemented under staff review and the stipulated construction requirements; no appeals or additional conditions were recorded in the hearing record.