Citizen Portal
Sign In

Get Full Government Meeting Transcripts, Videos, & Alerts Forever!

Kingston Select Board approves multiple measures including Plains electrical upgrade, compensation study and limited Draft House events

Kingston Select Board · June 3, 2025
AI-Generated Content: All content on this page was generated by AI to highlight key points from the meeting. For complete details and context, we recommend watching the full video. so we can fix them.

Summary

At its June 2 meeting the Kingston Select Board approved use of infrastructure-fund interest for a Plains electrical upgrade, awarded a $19,500 compensation-study contract to MRI, authorized staff to apply for a .gov domain, approved two Draft House outdoor-music dates pending site-plan work, approved a $2,500 lake-host match, and posted a part-time HR position.

The Kingston Select Board voted on several administrative and operational items at its June 2 meeting, approving a range of expenditures, authorizations and appointments intended to keep planned town projects on schedule.

The board voted to expend up to $42,000 from the infrastructure fund to pay a chosen contractor for an electrical-system upgrade at the Plains, covering a $39,614.95 bid plus up to $2,000 for panel backings and related materials. Speaker 1 opened the required public hearing and cited a June 2 email from trustee John Pramberg that reported $188,328.29 in interest available for disbursement. After no public comment,…

Already have an account? Log in

Subscribe to keep reading

Unlock the rest of this article — and every article on Citizen Portal.

  • Unlimited articles
  • AI-powered breakdowns of topics, speakers, decisions, and budgets
  • Instant alerts when your location has a new meeting
  • Follow topics and more locations
  • 1,000 AI Insights / month, plus AI Chat
30-day money-back on paid plans