Get Full Government Meeting Transcripts, Videos, & Alerts Forever!
Select Board approves DuBois & King studies and 60% design for South TIF water extension
Bow Select Board · May 28, 2025
AI-Generated Content: All content on this page was generated by AI to highlight key points from the meeting. For complete details and context, we recommend watching the full video. so we can fix them.
Summary
The board approved a $27,000 amendment to DuBois & King for booster‑station vs. storage‑tank modeling and authorized a $216,002.96 60% design contract for the South TIF water extension, funded from the TIF district.
At the May 27 meeting the board approved two engineering actions to refine the town’s water‑system planning. First, the board authorized an amendment (Amendment #3) to the existing DuBois & King contract for a lump‑sum $27,000 scope to model a conceptual booster pump station option, produce conceptual design and an opinion of cost and…
Already have an account? Log in
Subscribe to keep reading
Unlock the rest of this article — and every article on Citizen Portal.
- Unlimited articles
- AI-powered breakdowns of topics, speakers, decisions, and budgets
- Instant alerts when your location has a new meeting
- Follow topics and more locations
- 1,000 AI Insights / month, plus AI Chat
30-day money-back on paid plans

