Citizen Portal
Sign In

Get Full Government Meeting Transcripts, Videos, & Alerts Forever!

Get email alerts on the Transportation topic

No spam. Unsubscribe anytime.

County engineer seeks ODOT infrastructure loan for Albin Road roundabout; multiple plats and MS4 MOU approved

Lucas County Board of Commissioners · September 23, 2025
AI-Generated Content: All content on this page was generated by AI to highlight key points from the meeting. For complete details and context, we recommend watching the full video. so we can fix them.

Summary

The Lucas County engineer presented a preliminary term sheet for an ODOT infrastructure bank loan of about $3,008,000 for the Albin Road roundabout, an MOU for MS4 public education services, final plats for two subdivisions, and acceptance of a right-of-entry donation for a roundabout project; commissioners approved the items.

County Engineer Mike Panuski briefed commissioners on several engineering items and secured board approval on Sept. 23.

Panuski presented a revision and preliminary term sheet to obtain an Ohio Department of Transportation (ODOT) Infrastructure Bank loan for the Albin Road Roundabout. The preliminary loan amount presented was $3,008,000 at an interest rate of 3% over 18 years; Panuski explained ODOT asked for a higher authorized amount because actual loan draw amounts determine final lending, and unused portions would not be drawn.

Panuski also sought approval of a memorandum of understanding between the Lucas County Engineer and the Toledo Metropolitan Council of Governments to provide public education services in support of the county’s MS4 permit. The agreement starts at $12,000 in 2026 and increases by $250 per year to $13,000 in 2029.

Separately, the board approved final plats: Crimson, Ohio Plat 11 (Montclova and Waterville townships) with 22 lots, and Village on the Green Plat 2 (Waterville Township) with 27 lots. The board also accepted a right-of-entry donation related to the Swanton Road and Archbold-Whitehouse Road roundabout project at no cost to the county.

Each item was moved and approved by roll call during the meeting.