Get Full Government Meeting Transcripts, Videos, & Alerts Forever!
Consultants show preferred downtown green-space concept and three options for 350 Highway site
Summary
Consultants presented three concept designs for a downtown green space (Concept A favored in workshop) and three concepts for a 350 Highway parcel (townhomes, higher-density apartments with optional hotel, and duplex/recreation), noting the city does not own the 350 Highway site and no hotel feasibility study was done.
At the Planning Commission meeting, consultants presented two "opportunity site" concepts intended to illustrate how specific parcels could support the comprehensive plan's goals.
Downtown green space: Consultants showed three variations for a downtown green-space redevelopment, noting Concept A was the workshop'favorite. The preferred concept centers a preserved green space with an amphitheater, a farmers-market area and mixed-use buildings fronting the space. Bloom gave scale ranges for the preferred downtown design: "54 to 80 upper floor…
Already have an account? Log in
Subscribe to keep reading
Unlock the rest of this article — and every article on Citizen Portal.
- Unlimited articles
- AI-powered breakdowns of topics, speakers, decisions, and budgets
- Instant alerts when your location has a new meeting
- Follow topics and more locations
- 1,000 AI Insights / month, plus AI Chat
