Citizen Portal
Sign In

Get Full Government Meeting Transcripts, Videos, & Alerts Forever!

Get email alerts on the Facility Design topic

No spam. Unsubscribe anytime.

Supervisors adopt resolution exempting new Fire Station 2 from certain state energy and EV infrastructure mandates

King George County Board of Supervisors · August 6, 2025
AI-Generated Content: All content on this page was generated by AI to highlight key points from the meeting. For complete details and context, we recommend watching the full video. so we can fix them.

Summary

The board adopted a resolution finding that new Fire Station 2’s continuous power and readiness requirements make certain state energy-efficiency and EV‑charging infrastructure mandates impracticable for this facility type and granted a targeted local exemption.

King George supervisors adopted a resolution on Aug. 5 exempting the design of the new Company 2 fire and rescue station from specific Virginia code energy‑efficiency and EV‑charging infrastructure requirements on the basis that the mandates are impracticable for critical emergency services facilities.

Project architects and county counsel recommended the exemption after reviewing the code and identifying the statutory findings the board must make. The staff memo described continuous power demands, specialized operational needs and vehicle/equipment considerations for emergency services as the rationale for the targeted exemption. Counsel confirmed the board has authority to make the required findings and adopt the resolution.

A motion to adopt the resolution was made and passed by the board.