Get Full Government Meeting Transcripts, Videos, & Alerts Forever!
Bartlett approves $3.7 million design contract to address Fletcher Creek sewer capacity
Summary
The board approved a $3.7 million design contract with Barge Design Solutions for a sewer equalization tank and gravity sewer upgrades aimed at addressing Fletcher Creek sewer discharges; the plan calls for a 2.5 million-gallon tank (1.5M to meet current needs plus 1M for future growth).
The Bartlett Board of Mayor and Aldermen on Sept. 23 approved a $3.7 million design contract with Barge Design Solutions to design a sewer equalization (EQ) tank and related gravity sewer upgrades for the Fletcher Creek sewer basin.
John Horn, the city’s director of engineering, reviewed a multi-year study that began in 2019 after a City of Memphis report requested holding tanks to reduce flow rates during rain…
Already have an account? Log in
Subscribe to keep reading
Unlock the rest of this article — and every article on Citizen Portal.
- Unlimited articles
- AI-powered breakdowns of topics, speakers, decisions, and budgets
- Instant alerts when your location has a new meeting
- Follow topics and more locations
- 1,000 AI Insights / month, plus AI Chat

