Citizen Portal
Sign In

Get Full Government Meeting Transcripts, Videos, & Alerts Forever!

Bartlett approves $3.7 million design contract to address Fletcher Creek sewer capacity

Board of Mayor and Aldermen · September 24, 2025
AI-Generated Content: All content on this page was generated by AI to highlight key points from the meeting. For complete details and context, we recommend watching the full video. so we can fix them.

Summary

The board approved a $3.7 million design contract with Barge Design Solutions for a sewer equalization tank and gravity sewer upgrades aimed at addressing Fletcher Creek sewer discharges; the plan calls for a 2.5 million-gallon tank (1.5M to meet current needs plus 1M for future growth).

The Bartlett Board of Mayor and Aldermen on Sept. 23 approved a $3.7 million design contract with Barge Design Solutions to design a sewer equalization (EQ) tank and related gravity sewer upgrades for the Fletcher Creek sewer basin.

John Horn, the city’s director of engineering, reviewed a multi-year study that began in 2019 after a City of Memphis report requested holding tanks to reduce flow rates during rain…

Already have an account? Log in

Subscribe to keep reading

Unlock the rest of this article — and every article on Citizen Portal.

  • Unlimited articles
  • AI-powered breakdowns of topics, speakers, decisions, and budgets
  • Instant alerts when your location has a new meeting
  • Follow topics and more locations
  • 1,000 AI Insights / month, plus AI Chat
30-day money-back on paid plans