Applicant agrees to trim curb cut to 40 feet within six months to secure right‑of‑way exception
Summary
After review and exhibits from the applicant’s engineer, the board approved a conditional exception allowing an 85‑foot curb cut to be retained only if it is reduced to 40 feet and marked within six months; city staff said markings and curb reconfiguration must meet the access standards manual.
Get email alerts on the Right Of Way Exception topic
No spam. Unsubscribe anytime.
The Board of Public Works approved a conditional exception for a right‑of‑way permit after the applicant agreed to reduce an 85‑foot curb cut to the access standards manual’s recommended 40 feet within six months.
Cody Simpson, a project engineer with Morley, presented exhibits showing before‑and‑after photos and described the existing access. Simpson told the board the applicant would accept a six‑month period to implement the 40‑foot curb cut and to work with engineering staff on markings and acceptable construction details.
City engineering staff said the office prefers to control curb‑cut widths to a maximum of 40 feet and that curb‑cut markings and any required construction should be coordinated with the city engineer. A motion to approve Item 3 with the 40‑foot reduction and a six‑month compliance period carried unanimously.
Board members thanked the applicant for improvements made to the site and noted the city has observed positive change since earlier work. The board recorded the conditional approval and asked staff to follow up on markings and compliance.