Citizen Portal
Sign In

Get Full Government Meeting Transcripts, Videos, & Alerts Forever!

Get email alerts on the 200 California Alteration topic

No spam. Unsubscribe anytime.

Commission approves removal of nonworking clock tower and façade changes at 200 California Street with 6-1 vote

San Francisco Historic Preservation Commission · December 4, 2013
AI-Generated Content: All content on this page was generated by AI to highlight key points from the meeting. For complete details and context, we recommend watching the full video. so we can fix them.

Summary

The commission approved a major permit to alter 200 California Street, allowing removal of a nonfunctional clock tower, replacement of some windows with operable sash and coating of stone cladding, after extended public comment and a 6–1 roll-call vote; Commissioner Pearlman dissented.

Kelly Wong, planning department preservation staff, described a major permit application for 200 California Street, a Category 5 compatible-replacement building in the Front California Conservation District. The proposed scope includes rehabilitation of windows to operable sash, removal of a nonfunctioning clock tower above the corner bay, and cleaning and coating sandstone and limestone cladding to achieve a lighter, more compatible appearance.

Sponsor Scott Brady (Huntsman Architectural Group) described operable hopper and inward-swinging casement windows, a mineral-based Keim coating for the stone cladding that he said is breathable and reversible though not easily removed, and a proposed planted roof terrace with hedges. Public commenter Gail Malek questioned whether the building should be considered a historic structure and why the clock tower would be removed; several commissioners debated whether the tower is a distinctive feature and expressed differing tastes about coating and color choices.

After discussion and a request that material contrast and a materials board be recorded in conditions, the commission voted to approve staff recommendations with the listed conditions. The motion passed 6–1, with Commissioner Pearlman recorded as voting no. The conditions enumerate prior-to-issuance submittals including specifications for cleaning/coating sandstone and limestone, dimension details for the removal of the clock tower and corner bay windows/guardrail, and a materials board with finish samples for new sash and coatings.

The staff and sponsor agreed to provide clearer drawings and samples in follow-up submissions to address commissioners' concerns about contrast and maintainability of finishes.