Commission approves AT&T antennas at 1801 Broadway amid tenant objections

San Francisco Planning Commission · August 9, 2012
AI-Generated Content: All content on this page was generated by AI to highlight key points from the meeting. For complete details and context, we recommend watching the full video. so we can fix them.

Summary

Commissioners approved a conditional use permit for four panel antennas at 1801 Broadway, after tenants who live directly below the proposed installation spoke against it and the property owner and AT&T said the antennas would be directional and the older omni antenna would be removed.

The Planning Commission approved AT&T's conditional use authorization to install four rooftop panel antennas at 1801 Broadway after hearing tenant concerns and technical clarification from the sponsor and consultants.

Planning staff clarified an error in the packet (the proposal is for four, not nine, antennas) and said the site is a location preference 7 site that required an alternatives analysis and third-party verification. AT&T and its consultant explained the proposal involves panel antennas and that they will decommission an existing omni antenna as part of the upgrade.

Several residents of the top-floor units directly beneath the proposed installation spoke in opposition, citing concern about close proximity and potential health effects; one speaker said she was expecting a child and asked the commission to reject the proposal for that reason. Chris Lundstrom, co-owner of the property, said the antennas are directional and oriented away from the building and that the sponsor had worked with tenants on mitigation and testing.

A consultant explained vertical and horizontal antenna radiation patterns and said proposed equipment complies with federal exposure guidelines. Commissioners moved to approve the CUP with conditions; the motion passed unanimously.

The decision includes the condition that the sponsor provide required post-installation RF measurements and documentation. Staff will ensure those conditions are met prior to full activation of the site.