Board conditions deck permit on revised drawings, geotechnical report at Dealwood Way property
Summary
For a permit to alter a property at 265 Dealwood Way, the Board of Appeals granted the permit conditioned on revised drawings (dated 08/19/16) and incorporation of a geotechnical report and special inspections; DBI staff said the proposed drilled‑pier design was reviewed and accepted by DBI engineers.
The San Francisco Board of Appeals on Aug. 24, 2016, granted a contested alteration permit for 265 Dealwood Way after approving revised drawings and requiring the project to include the submitted geotechnical report and third‑party observation during drilling.
DBI inspector Joe Duffy described a proposed drilled‑pier foundation system consisting of three 18‑inch piers with approximately 3 feet of embedment into bedrock; DBI engineer Cyril Yu…
Already have an account? Log in
Subscribe to keep reading
Unlock the rest of this article — and every article on Citizen Portal.
- Unlimited articles
- AI-powered breakdowns of topics, speakers, decisions, and budgets
- Instant alerts when your location has a new meeting
- Follow topics and more locations
- 1,000 AI Insights / month, plus AI Chat