After lengthy public testimony both for and against, the Planning Commission voted 5–1 to take discretionary review and approve a T-Mobile microcell installation at a prominent North Beach rooftop location, requiring screening of equipment cabinets; opponents had argued the area already had dense antenna coverage and the location was visually prominent.

The Planning Commission on May 11 approved a T-Mobile rooftop microcell installation in North Beach while resolving to require visual screening for equipment cabinets on the building's stair tower.

Planning staff summarized the proposal as a small, 5-foot-tall antenna enclosed in a 10-inch faux vent pipe with accompanying equipment cabinets; staff recommended denying discretionary review and allowing the building-permit-level accessory-installation process to proceed because submitted coverage maps and the limited size suggested no extraordinary circumstances. Opponents led by Termeya Giazarian argued the antenna is unnecessary given multiple nearby T-Mobile sites, that the mock-up is more conspicuous than the plan indicates and that a broader citywide master plan for wireless siting is needed.

T-Mobile representatives said the microcell would fill a measurable coverage gap and that the design is the least intrusive means to improve capacity; they submitted technical and legal memos stressing federal case law and prior appeals. Commissioners discussed cumulative siting, future 4G/LTE capabilities and aesthetics. Commissioner Sugaya moved to "take discretionary review and approve" the permit with a condition to screen the surface equipment; the motion passed 5–1 with Commissioner Moore dissenting.

Next steps: T-Mobile will work with department staff on a screening solution for cabinets; appeal rights and any subsequent building permits will follow standard timelines.