Citizen Portal
Sign In

Get Full Government Meeting Transcripts, Videos, & Alerts Forever!

Pompton Lakes planning board hears Washington Building plan to add eight apartments; engineers say structure can support addition

Pompton Lakes Redevelopment Agency and Planning Board · October 25, 2024
AI-Generated Content: All content on this page was generated by AI to highlight key points from the meeting. For complete details and context, we recommend watching the full video. so we can fix them.

Summary

Applicant for the Washington Building presented soil and structural reports and designs for converting the second floor to eight apartments; the board requested revised engineering drawings, ADA/storefront details and brick/color samples and set an expected return for further review.

The Pompton Lakes planning board heard a formal application from Washington Urban Renewal at Pompton Lakes LLC to convert the Washington Building's second floor from office space to eight apartments and to renovate ground-floor retail.

Attorney Steven Beltre told the board the applicant submitted a soil investigation (dated 09/05/2024) and structural plans (dated 09/10/2024). Beltre said the team "believes that we have shown that we have structural integrity, that the foundation, the soils, and the First Floor will support the Second Floor addition." Both a geotechnical report and a sealed structural plan were entered into the record and the board accepted the applicant's…

Already have an account? Log in

Subscribe to keep reading

Unlock the rest of this article — and every article on Citizen Portal.

  • Unlimited articles
  • AI-powered breakdowns of topics, speakers, decisions, and budgets
  • Instant alerts when your location has a new meeting
  • Follow topics and more locations
  • 1,000 AI Insights / month, plus AI Chat
30-day money-back on paid plans