Representatives from GPI told the Natural Resources Commission they need seven additional exploratory borings along the alignment of the proposed Aspen River pedestrian trail bridge at 68 Commonwealth Avenue and 300 Baker Avenue to inform abutment and embankment design after a slight design shift.
Alexa (identified on the record) said prior borings authorized under a 2021 RDA used a track-mounted all-terrain vehicle and that the new work will follow similar access routes where possible. The team said it may use seismic refraction survey methods in some locations to reduce ground disturbance and that timber matting could be required for access in wet sections.
GPI noted the proposed borings fall within bordering vegetated wetlands, land under water, and the 200-foot riverfront area governed by the Wetlands Protection Act and Concord’s wetland bylaws; two borings are within land under water on the eastern bank and several are within riverfront areas outside the 100-foot buffer but within the 200-foot riverfront zone. GPI stated the borings may be considered minor, temporary activities and cited a regulatory provision in the 310 CMR series as a potential basis for limited-impact exemptions (as recorded in the transcript).
Commissioners asked whether the borings were needed because of a change in route or design; GPI and Sam Campbell responded that minor shifts and inaccessible locations in prior borings drove the request and that MassDOT geotechnical guidance requires subsurface information to advance abutment/piers design.
Commissioner Jim Smith moved that the NRC issue a Negative Determination of Applicability for application 24-17 (300 Baker Avenue) with these conditions: hold a pre-construction conference with DNR staff; conduct work in the dry where feasible; allow swamp/timber mats as needed; seed disturbed areas with a native seed mix provided to staff at or before the pre-construction meeting; and require a post-project letter to the NRC confirming work complied with the determination and describing any departures from the RDA. The motion was seconded and carried unanimously.
Don't Miss a Word: See the Full Meeting!
Go beyond summaries. Unlock every video, transcript, and key insight with a Founder Membership.
✓
Get instant access to full meeting videos
✓
Search and clip any phrase from complete transcripts
✓
Receive AI-powered summaries & custom alerts
✓
Enjoy lifetime, unrestricted access to government data
Search every word spoken in city, county, state, and federal meetings. Receive real-time
civic alerts,
and access transcripts, exports, and saved lists—all in one place.
Gain exclusive insights
Get our premium newsletter with trusted coverage and actionable briefings tailored to
your community.
Shape the future
Help strengthen government accountability nationwide through your engagement and
feedback.
Risk-Free Guarantee
Try it for 30 days. Love it—or get a full refund, no questions asked.
Secure checkout. Private by design.
⚡ Only 8,022 of 10,000 founding memberships remaining
Explore Citizen Portal for free.
Read articles and experience transparency in action—no credit card
required.
Upgrade anytime. Your free account never expires.
What Members Are Saying
"Citizen Portal keeps me up to date on local decisions
without wading through hours of meetings."
— Sarah M., Founder
"It's like having a civic newsroom on demand."
— Jonathan D., Community Advocate
Secure checkout • Privacy-first • Refund within 30 days if not a fit