Commission approves dock extension at 270 Beach with mitigation and pile removal noted
Summary
The Planning Commission approved design review and a use permit to extend a floating dock adjacent to 270 Beach Road and adopted an initial study/mitigated negative declaration; staff and consultants outlined eelgrass mitigation, noise control for pile work and removal of two existing piles.
Get email alerts on the Shoreline Permitting topic
No spam. Unsubscribe anytime.
The Belvedere Planning Commission approved a proposal to extend an existing floating dock adjacent to 270 Beach Road and granted a use permit for the city-owned water parcel.
Staff said the project would add a 223-square-foot L-shaped extension to an existing 352-square-foot floating dock, install one new 12-inch steel pile and remove two existing birthing piles on the dock’s northern side. An initial study/mitigated negative declaration prepared for the project identified potential impacts to biological and cultural resources and to noise; mitigation measures listed included eelgrass monitoring and mitigation plans and a noise-control plan to limit pile-driving impacts. Staff recommended the commission adopt the MND and approve design review and a use permit.
Alec Wilson, the project architect, described the L-shaped addition and said materials would match the existing dock (cedar) and that the steel piling would be painted black. Sean of Sunset Ecological Solutions, the permitting consultant, explained that piles are typically vibrated in and out (agencies sometimes allow limited impact hammering), that removal times depend on substrate, and that modern steel piles (coated) perform well environmentally compared with historic creosote-treated timbers.
Albert Richards, a neighbor at 266 Beach Road, told the commission he supports the project and welcomed removal of the two industrial-looking piles.
Commissioners asked staff to ensure the resolution explicitly records the removal of the two existing piles; staff agreed to add the wording to the draft whereas clauses. The commission then adopted the initial study/mitigated negative declaration, design review to extend the floating dock, and a use permit to expand the city-owned dock, all by affirmative vote.
Next steps: Staff will finalize resolution language to note pile removal, work with regulatory agencies to implement mitigation measures (including eelgrass monitoring), and enforce agency sign-offs before building permits are issued.