Committee members reported water lines were shut off after cracks, scheduled plumbing and new well-house work for early November, described a repaired grinder pump installation issue, and noted positive feedback from recent events and interest in security cameras.
Get email alerts on the Facilities Maintenance topic
No spam. Unsubscribe anytime.
Members of the Richland County Fair Committee reviewed recent facility issues and upcoming maintenance work at the fairgrounds, and discussed recent event feedback and security measures.
Speaker 4 reported the fairgrounds' water supply has been shut off after multiple water lines cracked. The committee scheduled plumbing and heating work for the first full week in November to install two new well-house buildings, new above-ground pressure tanks and updated plumbing. Speaker 4 said the shutdown was necessary after valves weakened and began leaking.
On equipment problems, Speaker 4 described a grinder pump malfunction during the Hub City Dirt Drags. According to the transcript, the pump had been improperly installed: the "U" pipe had not been pushed down and locked into place, which caused the pump to circulate rather than pump out. Staff pushed the U pipe into the locked position, tested the pump and said it has operated without issue since.
The committee also reported storage-room activity (scheduled weekend work), that door latches were replaced after some doors popped open, and that no significant damages were reported following recent events. Members said Hub City Dirt Drags and Wheels of Time organizers were satisfied with the venue and are interested in returning. Speakers discussed pursuing more nightly entertainment during the fair and using the grandstand for events that could remain ticketed even if general gate pricing changes.
Security and theft were raised near the end of the meeting. Speaker 1 asked about installing a more reliable security-camera system and noted several catalytic-converter thefts over the past two years; Speaker 4 said the committee is looking into alternative, more reliable systems.
What happens next: The committee will proceed with the scheduled November plumbing work, continue monitoring repaired equipment, and consider security-camera options; no additional formal actions were recorded on these items in the meeting transcript.