Citizen Portal
Sign In

Get Full Government Meeting Transcripts, Videos, & Alerts Forever!

Board adopts bridge resolution, hears wetland mitigation cost estimate for county project

Chickasaw County Board of Supervisors · November 18, 2024
AI-Generated Content: All content on this page was generated by AI to highlight key points from the meeting. For complete details and context, we recommend watching the full video. so we can fix them.

Summary

County engineer Roland Lensing reported replacement of decayed bridge caps and introduced Resolution 11-18-24-48 to remove a load posting and return Bridge 0061 to legal status; he also advised wetland mitigation credits for a separate bridge project are estimated at $14,160.

County engineer Roland Lensing told the Chickasaw County Board of Supervisors on Nov. 18 that bridge crews replaced decayed components on Bridge 0061 and recommended lifting the load posting.

"Our bridge crew did a fantastic job," Lensing said while introducing Bridge Resolution 11-18-24-48 to remove the load posting and return…

Already have an account? Log in

Subscribe to keep reading

Unlock the rest of this article — and every article on Citizen Portal.

  • Unlimited articles
  • AI-powered breakdowns of topics, speakers, decisions, and budgets
  • Instant alerts when your location has a new meeting
  • Follow topics and more locations
  • 1,000 AI Insights / month, plus AI Chat
30-day money-back on paid plans