Citizen Portal
Sign In

Get Full Government Meeting Transcripts, Videos, & Alerts Forever!

Get email alerts on the Commercial Development topic

No spam. Unsubscribe anytime.

Market Basket presents MB Spirits proposal and circulation changes; ZBA asks for follow-up materials

Zoning Board of Appeals · October 8, 2024
AI-Generated Content: All content on this page was generated by AI to highlight key points from the meeting. For complete details and context, we recommend watching the full video. so we can fix them.

Summary

LT Development introduced a preliminary site plan for a Market Basket redevelopment at 170 Everett Ave that includes a standalone MB Spirits liquor store, reconfigured bus and drop-off circulation, stormwater improvements, and a master-plan MOA; the ZBA requested additional technical materials and deferred a final decision.

Representatives for LT Development presented a conceptual site plan for Market Basket at 170 Everett Avenue and an attached freestanding MB Spirits liquor store that would require a special permit. The board did not act; the item will return after planning-board and conservation-commission reviews.

Development manager Carmine Thomas described a proposal that includes an approximately 19,978-square-foot MB Spirits building adjacent to Market Basket, reconfigured parking and access to improve bus and rideshare circulation, a new curb cut on Carter Street, 16 taxi/rideshare spaces, and three proposed subsurface detention systems with a sand filter to improve stormwater quality.

Traffic and engineering consultants (VHB) explained the revised bus circulation: buses would be able to stack on-site, enter via a new curb cut and exit to Carter Street; the petitioners said they had been coordinating with the MBTA on routing. Planning staff requested additional materials ahead of the next ZBA hearing, including a detailed landscape plan specifying species and sizes, an exterior lighting plan complying with International Dark Sky guidelines, clarified erosion-control detail placement, and expanded traffic study coverage of surrounding intersections.

Councilor Leo Robinson spoke in support of continuing the MOA-driven master-plan review process. The board directed the petitioner to provide the requested technical materials for the planning board (Oct. 22) and to appear again before the ZBA on Nov. 12.