Summary

The Redevelopment Commission approved funding and contracts for the Fillmore Road improvement, utility casings for State Road 2, inspection and design contracts, Donahue modeling amendment and multiple advertising requests for water and sewer projects; roll-call votes recorded for each motion.

At its meeting the Redevelopment Commission approved a slate of funding and professional-service items that will allow road and utility work in the New Carlisle Economic Development Area to proceed.

Key approvals and amounts (motion outcomes recorded by the commission): - Fillmore Road Improvement Project: commissioners approved funding to cover the anticipated low bid plus a 10% contingency (staff cited a low bid of $2,500,000 and a high bid of $3,100,000; the approved funding range discussed was approximately $2.8M–$3.2M). Motion carried on roll call.

- Amendment 1 to INDOT interlocal (casing pipes under State Road 2): the commission approved a not-to-exceed amount of $927,822.90 to install four casing pipes to provide utilities to the south side of State Road 2 (staff said this work helps ensure water and sewer availability by May 1, 2025). Motion carried on roll call.

- Professional services and contracts: • NICTD refresh study (rail/station study refresh): county share not to exceed $72,500 (50/50 with NICTD; total project ~$145,000). A commissioner abstained; motion carried. • Fillmore Road inspection services (Lochmuller Group): not-to-exceed $353,570 for multi-season inspection work; motion carried. • Donahue & Associates Amendment 3 (water-system modeling): additional $10,000, total contract subsequently reported at $226,100; motion carried. • Frontage road design (Lawson Fisher): contract for $679,195 for frontage-road design, ditch crossings and permitting to serve southern sites; motion carried.

- Advertising and bid schedules: the commission approved advertising the SJEC Water Treatment Plant Phase 3, the State Road 2 Force Main/Lehi Station gravity sewer and water main, and the Smilax Briar lift station and force-main replacement with ad dates in August and bid openings in September. Motions carried on roll call.

Vote patterns: most votes were recorded as unanimous ayes in the meeting transcript (Mister Lane, Mister Goebel, Mister Horvath/Hornbach/Hornbaum variants and Mister Jordan recorded in roll calls). On the NICTD refresh study, a recorded abstention was noted from one commissioner; staff and the record indicated the motion nonetheless carried.

What it means: with these approvals staff can proceed to advertise, award, and perform early utility and road work tied to development activity in the New Carlisle area, including casing installations that will speed utility access for the southern site.

Ending: The commission recorded the motions and votes and approved the spending and contracts necessary to keep multiple linked infrastructure projects on schedule.