Citizen Portal
Sign In

Get Full Government Meeting Transcripts, Videos, & Alerts Forever!

White House details erosion-control pilot, ditch repairs and box culvert work

Stormwater Advisory Board, City of White House Public Services Department, Stormwater Division · June 13, 2023
AI-Generated Content: All content on this page was generated by AI to highlight key points from the meeting. For complete details and context, we recommend watching the full video. so we can fix them.

Summary

Staff described Flexomat erosion-control installations on Pinson and Union Road, Greenway pipe replacement, and box culvert capital projects at Hobbs Drive, Villages Court and Apache Trail; utility conflicts with water and gas lines were noted.

City stormwater staff gave the board a progress update on several maintenance and capital projects during the June 12 meeting.

Isaiah, presenting for the Stormwater Division, described a pilot erosion-control material called "Flexomat," which he said is a rollable matting containing concrete aggregates that allows grass to grow through the material. "Flexomat is a new product and it's sort of like a roll matting of sorts...It mimics straw matting, except it has concrete in it," Isaiah said, and noted…

Already have an account? Log in

Subscribe to keep reading

Unlock the rest of this article — and every article on Citizen Portal.

  • Unlimited articles
  • AI-powered breakdowns of topics, speakers, decisions, and budgets
  • Instant alerts when your location has a new meeting
  • Follow topics and more locations
  • 1,000 AI Insights / month, plus AI Chat
30-day money-back on paid plans