Citizen Portal
Sign In

Get Full Government Meeting Transcripts, Videos, & Alerts Forever!

Warr Acres adopts change order, gets wastewater master‑plan update; consultant recommends prioritized upsizing projects

Warr Acres City Council · October 15, 2024
AI-Generated Content: All content on this page was generated by AI to highlight key points from the meeting. For complete details and context, we recommend watching the full video. so we can fix them.

Summary

Consultants reported results of a sanitary sewage evaluation (887 manholes inspected; 101 in very poor condition) and recommended priority upsizing projects that would use a proposed $10.2M loan. Council ratified a deductive change order on the 21‑inch interceptor that reduced project cost by $60,249 after switching some sections from CIPP to open cut.

Consultants updated the council Oct. 15 on the sanitary sewer evaluation study (SSES) and wastewater master plan. Staff said the SSES inspected about 887 manholes; consultants identified 101 as very poor condition and 176 as poor, with 155 showing evidence of surcharge and 243 showing infiltration. The consultant recommended prioritizing several upsizing projects — including…

Already have an account? Log in

Subscribe to keep reading

Unlock the rest of this article — and every article on Citizen Portal.

  • Unlimited articles
  • AI-powered breakdowns of topics, speakers, decisions, and budgets
  • Instant alerts when your location has a new meeting
  • Follow topics and more locations
  • 1,000 AI Insights / month, plus AI Chat
30-day money-back on paid plans