This article was created by AI summarizing key points discussed. AI makes mistakes, so for full details and context, please refer to the
video of the full meeting.
Please report any errors so we can fix them.
Report an error »
KB Homes presented a plan development application (PD‑24‑1261) to build up to 63 single‑family homes on approximately 18 acres in Seffner. Developer counsel Clayton Bricklemyer described concessions made after neighbor outreach, including a 6‑foot perimeter fence along several boundaries and a gated emergency/pedestrian access to Taylor Road rather than an unrestricted vehicular connection.
Transportation and drainage experts testified that the proposed access configuration meets the county’s traffic standards and that the site’s stormwater design will comply with the county’s Drainage and Roadway Performance Manual and land development code. Transportation consultant Michael Yates said driveway operations would be acceptable and Richard Perez of the county’s transportation section confirmed a required cross‑access stub to the south is a code requirement to accommodate future subdivision connectivity.
Dozens of residents testified in opposition. Speakers cited heavy daily congestion on Parsons Avenue and Old Hillsborough Avenue, historic flooding on Taylor Road and nearby yards, and concern that increased density would worsen drainage and parking pressure. Several residents asked that no vehicular access be allowed to Taylor Road and requested more buffering and an opaque privacy fence rather than open PVC fencing around the retention pond. One resident argued the subdivision pattern would not match existing one‑acre lots nearby and urged transitional lot sizing and earlier developer outreach.
Developer counsel offered rebuttal and reiterated that stormwater and subdivision review would require technical permitting that may address conveyance and downstream improvements. The developer added the fence and screening concessions to the plan and said emergency access would be gated with Knox‑box control. The hearing master closed the case; any subdivision approvals and engineering permits will proceed through subsequent county subdivision and stormwater reviews if the rezoning is approved.
Don't Miss a Word: See the Full Meeting!
Go beyond summaries. Unlock every video, transcript, and key insight with a Founder Membership.
✓
Get instant access to full meeting videos
✓
Search and clip any phrase from complete transcripts
✓
Receive AI-powered summaries & custom alerts
✓
Enjoy lifetime, unrestricted access to government data
Search every word spoken in city, county, state, and federal meetings. Receive real-time
civic alerts,
and access transcripts, exports, and saved lists—all in one place.
Gain exclusive insights
Get our premium newsletter with trusted coverage and actionable briefings tailored to
your community.
Shape the future
Help strengthen government accountability nationwide through your engagement and
feedback.
Risk-Free Guarantee
Try it for 30 days. Love it—or get a full refund, no questions asked.
Secure checkout. Private by design.
⚡ Only 8,016 of 10,000 founding memberships remaining
Explore Citizen Portal for free.
Read articles and experience transparency in action—no credit card
required.
Upgrade anytime. Your free account never expires.
What Members Are Saying
"Citizen Portal keeps me up to date on local decisions
without wading through hours of meetings."
— Sarah M., Founder
"It's like having a civic newsroom on demand."
— Jonathan D., Community Advocate
Secure checkout • Privacy-first • Refund within 30 days if not a fit