Citizen Portal
Sign In

Get Full Government Meeting Transcripts, Videos, & Alerts Forever!

Get email alerts on the Infrastructure Grants topic

No spam. Unsubscribe anytime.

Seneca County reports roughly $25 million in recent water/sewer grants, plans fixes for Romulus meter

Seneca County Board of Supervisors · November 26, 2024
AI-Generated Content: All content on this page was generated by AI to highlight key points from the meeting. For complete details and context, we recommend watching the full video. so we can fix them.

Summary

County staff reported $21 million (and additional awards totaling about $25 million) in grants for the 5 Points wastewater facility and a $4 million BIL award for Willard; they also identified installation issues with an ultrasonic meter in Romulus and proposed in‑house corrections and a modest custom shelter to ensure accurate readings.

Seneca County’s Water and Sewer committee reported major grant successes and detailed a technical correction for a problematic water meter installation in Romulus.

Staff said the 5 Points wastewater facility has received multiple awards totaling roughly $21 million (including a BIL award and earlier state grants) and that the county applied for about $32.5 million in grants with $25 million already received and $7.5 million still pending. Willard was reported to have $4 million in BIL funding and a 0% hardship loan. Staff emphasized that per‑customer cost impacts will likely be a fraction of earlier estimates, but final figures will depend on DC input and bids.

The committee also reviewed an ultrasonic water meter installation in Romulus that was not installed to manufacturer specifications: insufficient straight‑run pipe created flow disturbances and the meter‑house building was undersized. Staff proposed an in‑house solution involving a custom wooden shelter estimated at roughly $10,000–$11,000 (versus a metal hot box at $35,000–$38,000) and additional in‑house remediation of piping so the meter will read accurately. The committee asked staff to return with more detailed steps at the next meeting.

Committee members celebrated the grant awards and said the next actions will focus on ensuring projects are ready to bid and do not require returning grant funds.