Get Full Government Meeting Transcripts, Videos, & Alerts Forever!
Design board gives guidance on temporary All In Credit Union site in scenic corridor
Summary
All In Credit Union requested feedback on placing a temporary, operations-only banking facility in the scenic corridor while its permanent building is constructed. Staff and board urged applicants to meet scenic corridor standards as closely as possible, obtain required building-department clearances, and submit detailed site plans showing access, ADA, parking and construction-staging limits.
Tim Brown, planning and development, briefed the board on a request from All In Credit Union to place a temporary banking facility at the southeast corner of Sugar Drive and Highway 98 while their permanent building is under construction. Brown said the parcel sits inside the scenic corridor and lacks direct frontage on Highway 98.
Derek McCarthy of NorthStar Engineering, representing the applicant, described the temporary structure as…
Already have an account? Log in
Subscribe to keep reading
Unlock the rest of this article — and every article on Citizen Portal.
- Unlimited articles
- AI-powered breakdowns of topics, speakers, decisions, and budgets
- Instant alerts when your location has a new meeting
- Follow topics and more locations
- 1,000 AI Insights / month, plus AI Chat

