Citizen Portal
Sign In

Get Full Government Meeting Transcripts, Videos, & Alerts Forever!

Resident tells city commission lead-remediation work left electrical, plumbing and permit problems

City Commission of Benton Harbor · December 16, 2025
AI-Generated Content: All content on this page was generated by AI to highlight key points from the meeting. For complete details and context, we recommend watching the full video. so we can fix them.

Summary

A Benton Harbor resident recounted problems after a lead-reduction project — failed electrical elements, a removed hot-water heater, leaks discovered behind a wall panel and difficulty obtaining permits — and asked the city to hold contractors accountable.

During public comment at the Dec. 16 Benton Harbor City Commission meeting, resident Glenda Wissnack (1181 Ogden Avenue) praised aspects of a state-led lead-reduction effort but detailed multiple problems she says remain at her home and at others’ properties. She told commissioners she found failed electrical work, a removed hot-water heater (which she said was cut in half), leaks that were discovered only after removing a bathroom panel and inconsistent inspection outcomes that left residents with repair bills.

“I am grateful for those, but I'm not really happy with the work that's…

Already have an account? Log in

Subscribe to keep reading

Unlock the rest of this article — and every article on Citizen Portal.

  • Unlimited articles
  • AI-powered breakdowns of topics, speakers, decisions, and budgets
  • Instant alerts when your location has a new meeting
  • Follow topics and more locations
  • 1,000 AI Insights / month, plus AI Chat
30-day money-back on paid plans