This article was created by AI summarizing key points discussed. AI makes mistakes, so for full details and context, please refer to the
video of the full meeting.
Please report any errors so we can fix them.
Report an error »
Wright County supervisors voted to approve final plans for the 4 Corner Bridge, a BRO project corrected in the meeting to a 14-by-12 twin box culvert.
Secondary Roads staff told the board the structure was misstated in prior discussion and is a 14-by-12 twin box culvert measured from outside box to outside box. The program currently lists an estimated budget of $600,000, and staff said the project is expected to be let through the Iowa Department of Transportation on March 17. Engineers’ cost estimates were presented to the board.
A supervisor moved to approve the final plans "as presented" and the motion passed by voice vote. Staff described end treatments (riprap and sheet pile) and said savings in one area would be used for additional protection on the outlet.
County staff will provide plan sets to the contractor and proceed with DOT letting procedures; no change to the county’s five-year program was recorded beyond approving the presented final plans.
Don't Miss a Word: See the Full Meeting!
Go beyond summaries. Unlock every video, transcript, and key insight with a Founder Membership.
✓
Get instant access to full meeting videos
✓
Search and clip any phrase from complete transcripts
✓
Receive AI-powered summaries & custom alerts
✓
Enjoy lifetime, unrestricted access to government data
Search every word spoken in city, county, state, and federal meetings. Receive real-time
civic alerts,
and access transcripts, exports, and saved lists—all in one place.
Gain exclusive insights
Get our premium newsletter with trusted coverage and actionable briefings tailored to
your community.
Shape the future
Help strengthen government accountability nationwide through your engagement and
feedback.
Risk-Free Guarantee
Try it for 30 days. Love it—or get a full refund, no questions asked.
Secure checkout. Private by design.
⚡ Only 8,016 of 10,000 founding memberships remaining
Explore Citizen Portal for free.
Read articles and experience transparency in action—no credit card
required.
Upgrade anytime. Your free account never expires.
What Members Are Saying
"Citizen Portal keeps me up to date on local decisions
without wading through hours of meetings."
— Sarah M., Founder
"It's like having a civic newsroom on demand."
— Jonathan D., Community Advocate
Secure checkout • Privacy-first • Refund within 30 days if not a fit