Liberty Lake reviews multimodal transportation goals; commission flags e-bike safety and mapping needs

Joint Planning Commission and Parks & Arts Commission · December 11, 2025

Get AI-powered insights, summaries, and transcripts

Subscribe
AI-Generated Content: All content on this page was generated by AI to highlight key points from the meeting. For complete details and context, we recommend watching the full video. so we can fix them.

Summary

Planning staff presented multimodal transportation goals and policies; commissioners urged an outward-facing map of bike/golf-cart routes, discussed municipal-code changes to permit/require registration of e-bikes and golf carts, and asked staff to coordinate with police on safety and permitting.

Staff introduced the transportation chapter of the comprehensive plan, emphasizing a multimodal vision that requires bicycle, pedestrian and alternative-mobility facilities on collectors and arterials and allows a multimodal pathway in lieu of separate sidewalks and bike lanes.

Commissioners discussed publishing an outward-facing map for the public (bike lanes, sidewalks and permitted golf-cart/golf-cart routes) and whether code updates or permitting should precede public-facing materials. Committee members said existing GIS layers and sidewalk master-plan work could feed a public map; staff said some municipal-code changes (to address e-bikes and micro-mobility) and an education component would follow.

The group also focused on safety and regulation for e-bikes, e-scooters and low-speed vehicles. A staff member relayed that the Liberty Lake Police Department regards e-bikes and e-scooters as a significant current safety issue, raising the possibility of registration, permitting and age or speed limits. Chief Simmons was identified as the staff lead expected to bring a municipal-code proposal to city council in the new year.

Other topics included intersection level-of-service standards (signalized and unsignalized), roundabout capacity guidance, the city’s existing voluntary Harvard Road impact-fee program and the need to keep right-of-way and street-width policy flexible for multimodal accommodations. Staff outlined a timeline for finishing the sidewalk master plan and network analysis in January and integrating those products into the comprehensive plan.

Next steps: staff will continue mapping and code work, coordinate with the police department on micro-mobility recommendations, and present draft municipal-code language and maps to council and the commissions as items are ready.