Citizen Portal
Sign In

Get Full Government Meeting Transcripts, Videos, & Alerts Forever!

Flint board authorizes emergency repairs after heating failure at Southwestern; Northwestern cleanup and temporary systems detailed

Flint Board of Education · December 18, 2025
AI-Generated Content: All content on this page was generated by AI to highlight key points from the meeting. For complete details and context, we recommend watching the full video. so we can fix them.

Summary

The Flint Board of Education approved an emergency repair authorization after a failed heat exchanger left parts of Southwestern without heat; contractors provided detailed repair and temporary‑heat cost estimates and said insurance may cover large portions of Northwestern cleanup and temporary heating costs.

The Flint Board of Education on Dec. 16 authorized emergency repairs at Southwestern High School after contractors identified a failed heat exchanger that left the center of the building without heat.

Superintendent Jones said contractors Johnson & Wood and Dean Boiler diagnosed the failure and that temporary heaters brought in by SERVPRO were insufficient to sustain normal operations. Board members were told the part is in and being installed and that the district will not return students to Southwestern until building‑wide testing confirms safe, consistent temperatures. The board approved Resolution 11.24, authorizing the repairs, in a roll‑call vote.

Contractors described the…

Already have an account? Log in

Subscribe to keep reading

Unlock the rest of this article — and every article on Citizen Portal.

  • Unlimited articles
  • AI-powered breakdowns of topics, speakers, decisions, and budgets
  • Instant alerts when your location has a new meeting
  • Follow topics and more locations
  • 1,000 AI Insights / month, plus AI Chat
30-day money-back on paid plans