Citizen Portal
Sign In

Get Full Government Meeting Transcripts, Videos, & Alerts Forever!

Get email alerts on the Land Use topic

No spam. Unsubscribe anytime.

Council approves conditional use permit for outdoor storage on South Hopkins with screening and surfacing conditions

City of Titusville City Council · December 10, 2025
AI-Generated Content: All content on this page was generated by AI to highlight key points from the meeting. For complete details and context, we recommend watching the full video. so we can fix them.

Summary

Council approved a conditional use permit allowing outdoor storage at 3838 and 3900 South Hopkins with four staff-recommended conditions including an 8-foot opaque screen, restored fencing, limits on stacking height and paved/stabilized surfaces; applicant said upgrades would improve aesthetics and neighborhood compatibility.

The City Council approved a conditional use permit (CUP #72025) on Dec. 9 to allow outdoor storage on two properties on South Hopkins Avenue (3838 and 3900). Staff recommended four conditions: screen outdoor storage areas with opaque masonry or an 8-foot fence/wall maintained in good condition; require building permits demonstrating fence restoration/installation at the two parcels; keep outdoor storage neat with materials not stacked above the screen height; and ensure outdoor storage areas are on paved or stabilized surfaces designed to prevent soil and water contamination.

Brad Parrish (staff planner) said the property was grandfathered from previous M-1 industrial zoning and the proposed use is permissible in the Indian River City neighborhood commercial district only through a conditional use permit with the staff conditions. The Planning & Zoning Commission recommended approval with those conditions.

Applicant Michael Lloyd told council the new ownership plans to repair screening, install an automatic gate, and bring the yard up to better standards to serve contractor tenants while keeping materials off residential streets. Neighbors asked for tabling in part to raise unrelated concerns; council cautioned speakers to remain on topic during the quasi-judicial hearing.

Member Nelson moved to approve the CUP with staff conditions; the vote was unanimous.

Next steps: Applicant must demonstrate compliance with the conditions through the building permit process and maintain screening and stabilized surfaces; staff will verify compliance through permit review.