Citizen Portal
Sign In

Get Full Government Meeting Transcripts, Videos, & Alerts Forever!

County seeks small engineering change for Victor Creek project; staff report pump stations and repairs performed well through storms

Mason County Commissioners · December 16, 2025
AI-Generated Content: All content on this page was generated by AI to highlight key points from the meeting. For complete details and context, we recommend watching the full video. so we can fix them.

Summary

Public works requested a small, engineer-stamped drawing and a not-to-exceed $750 adjustment to complete the Victor Creek project, and reported no sewage overflows after recent wet weather. Staff also summarized Lakeland Village repairs, an internal temp hire for solid waste, and holiday service changes at Belfair transfer station.

Public works staff told Mason County commissioners the Victor Creek project (a Department of Transportation-related contract) is at the final stages but requires a minor drawing revision: the pipe coupling location shown on drawings conflicts with a hanger sized for the pipe rather than the coupling. Because engineers require a stamped…

Already have an account? Log in

Subscribe to keep reading

Unlock the rest of this article — and every article on Citizen Portal.

  • Unlimited articles
  • AI-powered breakdowns of topics, speakers, decisions, and budgets
  • Instant alerts when your location has a new meeting
  • Follow topics and more locations
  • 1,000 AI Insights / month, plus AI Chat
30-day money-back on paid plans