HTC approves revised Fargo-area house with condition that exterior be ‘Nantucket gray’

HTC (Historic commission; named in transcript as "HTC") · December 17, 2025
AI-Generated Content: All content on this page was generated by AI to highlight key points from the meeting. For complete details and context, we recommend watching the full video. so we can fix them.

Summary

The HTC approved changes to a previously reviewed house (Fargo-area submission), requiring the applicant to change prominent white trim to Nantucket gray and to deliver final exhibit drawings showing the color and simplified detailing before permit sign-off.

The HTC approved revisions to a previously reviewed house near Fargo, voting to require the exterior trim color be changed to “Nantucket gray.” The motion, made by Commissioner Val Oliver, followed a presentation from the applicant’s design team and a detailed review by commissioners of roof pitch, dormer proportions and plate heights.

The applicant’s representative, Donaldo (Denaldo) Bergeron, and the project architect, Bill (identified by the applicant as the architect), described a lowered ridge (from 28 feet to 26 feet 10 inches), a simplified dormer and a second egress relocated to a second-floor deck to improve symmetry and internal egress. Commissioners said they appreciated the lower ridge and simplifications but repeatedly flagged concerns about the amount of white trim, the vertical massing and a visible flat-roof deck element.

Commissioner Joe Paul and Commissioner Angus McLeod recommended lowering some plate heights and adjusting garage-door proportions to reduce perceived verticality. Commissioner Val Oliver moved to approve the submission on the condition that the detailed color palette be changed to Nantucket gray; the motion passed on a roll call (ayes from Oliver, Paul, Connie Patton and Angus McLeod; the chair recorded a no but the motion carried). The commission instructed staff to require final, bubble-marked drawings (an Exhibit A or equivalent) showing the color change and the simplified trim details before staff issues any approval letters or permits.

The commission’s action resolves the outstanding design concerns tied to visibility and trim contrast; the record shows commissioners emphasized that the final color and trim exhibit be provided to staff for confirmation.

The architect and applicant said they would provide revised, bubbled drawings and material/color samples for staff review.

The commission moved on to the next item following the vote.