Citizen Portal
Sign In

Get AI Briefings, Transcripts & Alerts on Local & National Government Meetings — Forever.

DRC reviews Wolf Lake Ranch Phase 3 and Crossroads of Kelly Park Phase 3b; technical utility and wall design issues flagged

Apopka Development Review Committee · December 4, 2025

Loading...

AI-Generated Content: All content on this page was generated by AI to highlight key points from the meeting. For complete details and context, we recommend watching the full video. so we can fix them.

Summary

The DRC reviewed Wolf Lake Ranch Phase 3 (42 units) and Crossroads of Kelly Park Phase 3b (about 106 units clearing/grading), with planning and public works requesting utility cross sections, master utility plans, and structural wall details to protect storm pipes and future maintenance.

The Apopka DRC moved through several subdivision and site‑plan items including Wolf Lake Ranch Phase 3 and Crossroads of Kelly Park Phase 3b, flagging technical items reviewers want addressed before resubmittal.

Jean Sanchez, planning staff, introduced Wolf Lake Ranch Phase 3 (42 units west of Bonken Pines Road) and said she issued some housekeeping comments; Public Works and other departments indicated written comments would be provided. The applicant had no substantive questions at the DRC.

Crossroads of Kelly Park Phase 3b was presented by Catherine Lambert of Polis and Bennett. Public Works asked that on‑street parking stall widths be shown correctly (8 feet with curb), that future communications and power utilities be indicated in cross sections (to avoid future conflicts), and that structural wall designs include geogrid tieback details and a non‑obstructive easement for the width of tiebacks so future maintenance does not damage retaining‑wall elements or storm pipes. Staff also requested the master utility plan for cross‑checking and noted stormwater piping and right‑of‑way relationships deserve careful attention on final plans.

Departments confirmed no additional items at the meeting; applicants were asked to address the technical comments and resubmit plans.