Inframark reports temporary fixes for nitrate/drain-line issue; pumps and well repairs pending
Summary
Inframark reported high total dissolved solids linked to mineral buildup in an underground drain line; a temporary above-ground drain line is in place while Emtek analyzes the mineral buildup and a permanent repair plan is developed. Council approved the water/wastewater monthly report.
Get email alerts on the Water And Wastewater topic
No spam. Unsubscribe anytime.
At the Nov. 25 meeting, Doug from Inframark summarized water and wastewater operations and identified several maintenance issues and mitigation steps.
Key operational notes included continued tours and outreach, nutrient-credit sales totaling $18,558 this year, and fiscal front‑loading of December expenses that produced a monthly overage. On operations, Inframark reported high total dissolved solids in quarterly testing traced to mineral buildup in an underground rinse/drain line that reduced flow; staff installed a temporary above‑ground drain line to restore rinsing in the nitrate‑removal units while Emtek performs an analysis to guide a permanent repair. Inframark also reported two recent pump/well incidents—replacement motor on a backup high‑service pump received and scheduled installation; well 4 failed and cole Brothers will diagnose and advise on repair or replacement tomorrow.
Council discussed potential repair costs and accepted the October water and wastewater report by voice vote. Inframark said follow-up sampling will occur in early next month to measure the temporary solution’s effectiveness.